01
Egypt · Nuclear Infrastructure
El Dabaa Nuclear Power Plant
Construction reference for the first nuclear power plant in Egypt. The official FENSMA portfolio identifies Atomstroyexport as the customer and FENSMA LLC as contractor, with construction beginning in 2021.
4 power unitsVVER-1200 generation 3+Start: 2021
Official Project Reference ↗
02
Moscow · Cultural & Public Facility
ATOM Museum at VDNKh
FENSMA served as general contractor for the Rosatom pavilion, a seven-level building with three underground floors and a major cantilever over the exhibition space.
25,000 m² pavilion54 m cantilever20 m maximum height
Official Project Reference ↗
03
Moscow · Commercial Development
New Yandex Headquarters
Complex pit-enclosure and anchor works, including a monolithic slurry wall, large-scale excavation, and extensive soil-anchor construction.
800 mm slurry wall423,100 m³ excavation2,467 anchors
Official Project Reference ↗
04
Moscow Metro · Underground Infrastructure
Nizhegorodskaya Station Complex
Pit-shoring construction for the station and adjoining track area using deep slurry-wall structures.
40,000 m³ wall concrete34 m shoring depth0.8–1.0 m trench width
Official Project Reference ↗
05
Moscow Metro · Airport Integration
Vnukovo Metro Station
Construction of a monolithic slurry-wall structure for a shallow underground station integrated with Vnukovo Airport infrastructure.
600 mm trench width10,252 m³ wall concrete1,500 t reinforcement
Official Project Reference ↗
06
Moscow · Sports Infrastructure
Torpedo Stadium
Major zero-cycle works combining pile-field construction, secant piles, and extensive pit excavation for the stadium redevelopment.
4,700 piles4,252 m³ secant-pile concrete150,000 m³ excavation
Official Project Reference ↗
07
Moscow · Reconstruction
Olympic Sports Complex
Pit-enclosure and pile-foundation works for the reconstruction of one of Moscow’s landmark sports facilities.
8,400 m³ slurry-wall concrete9,400 m³ bored-pile concreteStart: 2019
Official Project Reference ↗
08
Moscow · Heritage & Residential
DUO Club House
Specialist foundation and ground-treatment works supporting the restoration and adaptation of a cultural-heritage property.
366 root piles368 secant piles1,764 linear m grouting
Official Project Reference ↗